Back to Blog
Medusa t1000 instruction manual5/29/2023 ![]() In 1913 Toledo, Angola and Western bought out the Silica Northern Railway, increasing its track length 2 1/4 miles to the northwest, connecting it with Centennial, Ohio. Largely the quarry funded its construction and the construction supplies were shared with the Toledo Terminal Railroad, which was also forming at this time. ![]() Originating as a spur of off the much larger New York Central Line at Central Avenue in Toledo, Ohio, the Railway linked the Silica Stone Quarries to the world. On July 11th, 1902, The Toledo, Angola and Western Railway with its 8 1/4 miles of track, was officially incorporated. Canaday Center for Special Collections may reserve the right to intervene as intermediary at its own discretion.Ĭompleted by: Benjamin Grillot, November 1998-June 1999 Researchers bear full legal responsibility for the acquisition to publish from any part of said collection per Title 17, United States Code. Processing Note: Some materials have been sampledĬopyright: The literary rights to this collection are assumed to rest with the person(s) responsible for the production of the particular items within the collection, or with their heirs or assigns. ![]() Toledo Angola and Western Railway Records, 1898-1986
0 Comments
Read More
Leave a Reply. |